We can provide Air Quality Plans at the Design Stage and Post Construction Sampling.
Post Construction Sampling is for measuring VOC's and Formaldehydes.
VOC Air Quality Testing is aimed at achieving BREEAM credits.
After the samples are gathered they are sent off to a laboratory for testing which takes 21 days.