Air Leakage: Dimensioned GA floor plans and dimensioned general sections in pdf format plus the air permeability target figure from the as designed SBEM or SAP calculation plus a site address and approximate completion date.
Acoustic Testing: Dimensioned GA floor plans and dimensioned general sections in pdf format plus sight of the Acoustic Design report, the Noise Assessment report and any acoustic planning conditions. Site address and approximate completion date.
Thermal Imaging: Dimensioned GA floor plans and dimensioned general sections in pdf format plus site address and approximate completion date.
VOC Air Quality: Dimensioned GA floor plans and dimensioned general sections in pdf format plus the Air Quality Plan if one already exists. The version of BREEAM being targetted.The site address and approximate completion date.
We average on a 2-3 week lead time, service depending. We can offer evenings and weekends at a surcharge if required and if available.
Air Leakage: Our engineers will work with you on the test date to identify leakage paths, carry out localized smoke tests, and recommend corrective actions with the target being compliance. If we can we will retest on the same visit.
Acoustic: We will identify and discuss issues with you after the testing as data has to be analysed off site.
Thermal Imaging: Our reports highlight issues and contain works order forms for completion by site to demonstrate remedial work undertaken by site post surveying.
VOC Air Quality: Reports identify issues and how to correct them ready for retesting.
Air Leakage: Test certificates and construction site visit reports are typically issued within 4-5 days of a successful test / site visit.
Acoustic Testing: Test results reports are typically issued within 4-5 days of testing.
Thermal Imaging: Reports are issued within 2 days.
VOC Air Quality Testing: Reports take 21 days from testing.